Gregor Specht

Operations Architect – Relocation, Supply Chain & Launch Management

“There is a better way.”

29 years in automotive and Tier-1 manufacturing, running my own practice since 2019 (SPECHT PROJECTS, formerly SPECHT CONCEPTS) across the Singapore/Batam-Germany corridor. I lead tool relocations, site transfers and series launches from data cleanup to stable start of production – fixing systems, not symptoms. As an INTJ architect I think in structures: strategy, execution, result. Based in Singapore/Batam, on-site for mandates in DACH and Southeast Asia.

  • Tool and production relocation, including under time pressure or insolvency conditions
  • Master data and BOM cleanup as the foundation for relocation and scale-up
  • Series launch and ramp-up, Phase 0 to stable series
  • Supplier switch and second sourcing without interrupting ongoing supply
  • Factory and material flow planning without new-build investment
  • Supply chain stabilization under delivery constraints

Magna International (Change Manager, global JIS/JIT coordination, 3 continents, EUR 100M annual revenue secured) · MAHLE Behr (Process development, cockpit product line, two greenfield projects at EUR 8M and EUR 60M, built own logistics database since 2002) · HBPO/Plastic Omnium (Change & Ramp-up Manager, Porsche Taycan cockpit) · SMP Deutschland/Samvardhana Motherson (Project Manager, master schedule across seven project leads) · BorgWarner Drivetrain Engineering (Investment assessment, EUR 32M VW hybrid module).

SPECHT PROJECTS, Singapore/Batam/Germany – Senior Interim Executive & Operations Architect

Qualification/sampling, forged bearing components, two Italian plants (PrimoTECS/Mutares for SKF): PPAP, customer approvals, production and logistics readiness.

Cleanroom/semiconductor relocation, Germany to Slovakia: led 20+ parallel workstreams, rebuilt SAP-based disposition and data migration from zero, series start after 12 weeks with no supply interruption, under insolvency conditions. First-attempt customer audit passed, particle count below the required ISO Class 4.

Manufacturing layout, special machinery (Mall + Herlan, Neuhausen): freed 1,900 sqm of floor space (30% footprint reduction), avoided EUR 1.9M CapEx, +35% revenue per sqm, integrated a major new order with no production interruption.

Supply chain stabilization, Carrier Transicold, Rouen: four-person OPEX team, EUR 0.25M/month reduction in special transport costs, 25% capacity freed in planning, 15% in goods receipt/warehouse.

Ramp-up, automotive Tier-1 Hungary (e-mobility/battery systems, NDA; OEM BMW): capacity management at the Tier-1/OEM interface, bottleneck eliminated, zero-defect series start.

Interim SCM, climate and cooling systems (NDA): 25% shorter procurement lead time.

Automotive Tier-1 (JIS/JIT) · Semiconductor and cleanroom, packaging to ISO Class 4 · Plastics and injection molding · Special machinery · Climate and cooling systems · E-mobility and battery ramp-up

Dipl.-Ing. (M.Sc. equivalent) Mechanical Engineering, RWTH Aachen (1993, thesis grade 1.0)

Lean Master and Six Sigma Black Belt (Q-Learning, ISO 18404/13053) · VDA 6.3 Process Auditor · IPMA Level D (GPM) · MTM Practitioner · Professional Scrum Master I · SAP Certified Application Associate, Production Planning (with distinction) · Google Gen AI Leader

SAP R/3 (PP, MM, EWM, SD) · MS Project · Excel/VBA · Access/SQL · Power BI · CATIA V5 · Delmia · JIRA

  • Master data and BOMs that drift apart across plants and stall a relocation
  • Missing disposition and supplier connectivity after losing the previous logistics/purchasing structure
  • Releasing floor space and capacity without new-build investment
  • Stabilizing a series launch under time and cost pressure
  • Supplier switches without interrupting ongoing supply

  • On-time series start even under insolvency or extreme time pressure
  • Redundancies in master data and inventory made visible and removed
  • Floor space and capacity released without new-build investment
  • Stable supply chain through the transition

As an INTJ architect I think in systems, not isolated fixes: I make redundancies in master data, BOM structures and supplier data visible and remove them before they delay a relocation or a launch. Measurable system architecture, not a slide deck.

Lean, Six Sigma DMAIC, value stream mapping, 5S, SMED, Kaizen · VDA 6.3, FMEA, APQP, PPAP, 8D · S&OP, JIS/JIT, second sourcing · MTM/REFA workforce planning · Schedule management (MS Project) for relocations and launches

  • Master data and BOM cleanup as the foundation for scale-up or relocation
  • Floor space and capacity gains without new-build investment, comparable to the Neuhausen project
  • Stable series launch at the new site with no supply interruption
  • Building a resilient disposition and supplier base at the target location

SPECHT PROJECTS

30% shorter ramp-up in an automotive relocation Germany-Romania. Cleanroom relocation to Slovakia under insolvency conditions, SOP after 12 weeks. EUR 1.9m saved and 35% more revenue per sqm through footprint optimisation.

Systems thinking, resilience under time pressure, cross-cultural communication (projects across Europe, Asia and Africa), ownership, structured problem solving, negotiation skills

Nationalität: Deutsch
Wohnort: Singapore / Batam
Position: Operations Architect / Senior Interim Executive
More / Contact: specht-projects.com
Sprachen: German (native), English (C1/Full Professional), Italian (B2), French (B1), Bahasa Indonesia (A2)

Olaf Hartwig

Master Industrial Engineering & Business Administration
(Diplom-Wirtschaftsingenieur)

Chief Transformation Officer – Carve Out, Value Creation, Digital Roadmap

CEO / COO in multisite Automotive & Machinery Industries in Germany, South Korea, Turkey, Italy, Poland, Hungary and Brazil | Manufacturing R&D Purchasing Quality | Industry 4.0 and Sustainability | Coach & People Manager | Supply Chain Ecosystem | Lean Manufacturing | Lighthouse End-to-End Operating System IWS | Operations / IT Strategy | H2 Green Energy | Greenfield | Factory Layout | Automation & Robotics | Digital Transformation | ERP | MES | Change Management | Circularity | AI

Autoneum Borgers SE & Co. KGaA | Bocholt, Germany | www.borgers-group.com

STS Group AG | Hallbergmoos, Germany| www.sts.group
PE-backed Global Automotive Supplier | 400 Mio. € Sales | 2.700 Employees
CEO Italy VP Business Unit Acoustics | Chief Operations Officer

Robert Bürkle | Freudenstadt| www.burkle.tech
PE-backed Global Surface Technology and Machinery | 120 Mio. € Sales | 500
Employees
CEO Hungary Managing Director | Chief Operations Officer

Managing Partner | JTF Join the Future Consulting | Munich
NEOM | Oxagon, Kingdom of Saudi Arabia, Red Sea Coast | www.neom.com

10/1992 – 09/1997: Master in Industrial Engineering and Business Administration | KIT University Karlsruhe
Mains: Corporate Planning, Industrial Production, Manufacturing Technologies, Marketing
Thesis: „Database Marketing Mercedes-Benz A-Class in Brazil“
10/1990 – 12/1991: Service | Red Cross | Sindelfingen, Germany
05/1990: A levels | Goldberg Gymnasium | Sindelfingen, Germany

Seminars: Functional Qualification & Leadership Competences:
▪ Lean Senior Expert in Production | IWEX | 10/2015 – 06/2016
▪ Negotiation Skills & Leadership | London Business School | 03/2010 & 11/2012

IT knowledge: PLM | ERP | MES | Sciforma | Microsoft Office| AI

Operations Performance Management, Throughput, Leadtime, Cost reduction,
Footprint, Greenfield, Brownfield, Ramp-up, Scale-up, Shutdown, Closing, Transfer

Fast returns. Cash and Profit focussed improvements.

Decision Maker following strong values with >25 years Top-Management experience
 Sales responsibility up to 130 Mio. € | Leading Operations with 750 employees
 Delivering Strategic footprint, Turnaround, Growth and Transformation on a global scale

 Collaborative Leader with innovative spirit and a talent for problem solving priorities
 Strategic Thinker with extended international competencies in people development
 Target orientated | accountable | resilient | analytic | team minded | organized | assured

Moving the needle in Manufacturing, one to two levels up, 20-30% better efficiency, cost cash and leadtime reduction, improvments driven by data, sustainability and transformation

New Program Launch Cost reduced -80% | -72% Order leadtime improved | Value Add
increased +52% | Operating Profit improved by 16% yearly | Indirect Cost reduced by 5%
p.a. | Efficiency improved +32% | Production plant transferred in <60 days | Greenfields in Korea, Poland and Hungary up and running in <12 months

World Class Manufacturing, Value Stream Mapping, Value Stream Design,
Roadmaps, International C Level, Multi Project Management, Multi Site Management, Transformation, Standardization, Building Up Management Structures, PPAP, Roll out, Hydrogen, New Business, Central PMO teams, P&L-responsibility, Accelerated Digital, Training, APQP, Purchasing, Sustainability, Plato, Stage Gate Reviews, Expansion, Change Management, Digitalization, Footprint, Chemical, Customization (lot size 1), Greenfield Plant Layout, Design, Construction, AI, Microsoft Office, WEF accredited, Expert Services, Restructuring, KPI Systems, R&D, VAVE, Pull Flow, MES, Supply Chain Management, Logistics, Lighthouse Operating System, ERP, Plant Structure, NPI, Quality Management, Industry 4.0, Sciforma, Carve Out, PMI, Risk Management, Site selection, Lead Index Development, Lean Manufacturing, Steering Data, Change Management, Value Creation, Program Management PMO, English fluent, French fluent, Italian basic, Portuguese basic

Nationalität: Deutsch
Wohnort: Germany
Position: Chief Transformation Officer
Geburtsjahr: 1971
Sprachen: German (Mother tongue), English, French (Fluent), Italian, Portuguese (Basic)